Preparations for Publish 3
06/11/2013
The SWGEmu Staff
We all knew the time would come. Liking the changes that needs to be done, is a different story. Everyone wanted an announcement about Publish 3. Well, I have the first to hand out.
NBZ (No Build Zone) & POI are the zones that will not be allowed to have any structures built on them. Anyone that has a structure at ANY of these locations needs to have them redeeded and moved immediately. Here is what will happen if they remain when Publish 3 merges with Basilisk:
- Any structure left will be destroyed.
- Any structure destroyed will not have a deed to claim.
- Any items inside the structure will be destroyed.
There will be no notice given by a staff member when the structure is destroyed. You have been given the opportunity to remove it and it is your choice if it remains and action is taken. Here is our NBZ list with exact coordinates, radius and names pulled directly from the code (Thank you Ivojedi): No Build Zones
~ The SWGEmu Staff